Case studies
Measured results, achieved on the shop floor
Backlogs cleared, lead times shortened, inspection findings closed: discover how pharmaceutical sites have transformed their Quality with us, with the figures to prove it.
All case studies
Deviation backlog divided by 5 in 7 months, after a major inspection finding
Pharmaceutical CDMO · production site in France · 2025 – 2026
Deviation system redesigned across 4 sites: 64% fewer minor deviations
Biopharmaceutical group · headquarters and 4 sites in France · 2024 – 2025
45% fewer major deviations and an ANSM CAPA closed
Pharmaceutical company · 2 production units in France · 2025 – 2026
From 0 to 90% of records right first time, and 65% less data
CDMO · solid dosage forms · 600-person site
From 10% to 81% of records right first time on the move to commercial
Biologics production site · 50 people
Up to 50% shorter batch record throughput time in 8 months
CDMO · sterile liquid dosage forms · 300-person site
Batch records praised by inspectors, clearer and closer to the shop floor
Biologics production site · 700 people
Deviation backlog from 20 to 2 and no more overdue CAPAs, thanks to short rituals
API manufacturer · site of about 800 people · 2021 – 2022
From 45% to 30% of deviations older than 30 days in one month of management
Pharmaceutical production site · 2 entities · 2019 – 2022
Daily management to regain control of more than 700 deviations a year
Pharmaceutical company · injectables unit of about 200 people · 2023 – 2025
€6M of stock released and an anomaly backlog almost halved
Pharmaceutical CDMO · 2 production sites in France · 2023 – 2025
47% fewer “human error” deviations in 6 months
Clinical R&D site of about 1,000 people · packaging and distribution · 2023
Change control: 697 actions brought back under control in one summer
Pharmaceutical site of an international group · solid and liquid dosage forms · 2022
One day to bring meaning back to Quality: 96% satisfaction
Pharmaceutical production site in Switzerland · oral dosage forms and packaging · 2026
A process-based organisation: twice as much autonomy in the pilot workshop
API manufacturer (CDMO) · pilot workshop of 20 people · 2022
Documentation: from a 1-in-4 to a 7-in-10 chance of finding the right information
Implantable medical device manufacturer in Switzerland · two assembly lines · 2020 – 2021
What would the result be for you?
Measure the health of your deviation handling in a few minutes with the free BOOSTER assessment, or let’s talk about your situation.
